1971
E Type roadster (JB)
Major mechanical work, reassembly of dismantled car |
|
Update report - January 22, 2010
Your car is now ready for collection.
![]() |
![]() |
![]() |
We now have your car mechanically reassembled and we have already performed some basic road testing. So far, all major mechanical systems seem to be functioning pretty well.I know that you have asked us to re-use as much of the existing interior as possible, although certain items were just too rough to reinstall. The door panels, for example, were just plain nasty, so I had Carlos fabricate and trim new panels for you.
![]() |
![]() |
![]() |
|
|
|
|
|
|
![]() |
![]() |
![]() |
|
|
|
|
|
|
![]() |
![]() |
![]() |
|
|
|
The following sequence shows the repair of your oil pan, which had stripped out drain plug threads.
![]() |
![]() |
first welded up |
on the mill |
![]() |
![]() |
back in the car |
Short block assembly underway...
![]() |
![]() |
![]() |
|
|
|
We now have the assembly of your short block underway..
![]() |
![]() |
|
|
![]() |
![]() |
|
|
We have now finished all the machine work on the block, including honing the cylinders and surfacing the deck surface.
![]() |
![]() |
![]() |
|
timing chain cover in place |
We have now installed the new top hat cylinder sleeves. Next week we will be carrying out an align hone the honing the new cylinders to size.
![]() |
![]() |
![]() |
|
|
Boring out your old cylinder sleeves...
![]() |
![]() |
|
installing new sleeves |
Your IRS rebuild has now been completed....
![]() |
![]() |
![]() |
CJ springs, bronze bushings.. |
|
|
|
|
|
![]() |
![]() |
![]() |
|
|
|
We have now completed the rebuild of your cylinder head.
![]() |
![]() |
![]() |
|
|
|
![]() |
![]() |
![]() |
|
|
I am pleased to report that your car has arrived safely in Austin and we already have the engine and IRS rebuild underway.