1958
XK 150 roadster (JB)
Major mechanical overhaul |
We now have the cylinder head completely rebuilt and installed and have started installing all the other engine bay ancillaries, such as the new Mallory distributor, spin-on oil filter and of course the polished stainless steel headers. We should have the old car back on the road in the next week or so.
|
|
|
worked out perfectly |
convenience |
the finishing touch |
|
||
|
|
|
|
and modern oil filter |
|
Although we are not quite finished with the cylinder head yet, we went ahead and rebuilt the block and installed it in the car, along with your new CJ5 five speed. We have also completed the carb rebuild.
|
|
|
now completly rebuilt |
installed |
original bellhousing |
|
||
|
|
|
|
|
With the new engine sleeves installed, the following photos show the new cylinders being finish honed.
|
|
|
and polished |
sleeves |
respective cylinders |
|
||
|
|
|
installed sleeves |
We have been steadily gathering various new components while we wait for the engine machine work to be completed.....
|
|
into your cylinder head rebuild |
|
|
|
|
|
provide the sounds.... |
|
The first photograph below (scanned from Philip Porter's excellent "Original XK" book) shows how the factory cut away the right hand engine bay sidewall to make room for the triple carbs used on the 'S' models. The next photographs show your car, before and after the same side panel has been removed.
|
|
|
engine bay |
to make room for the triple cabs |
moved to the LH side |
|
||
|
||
|
With the front suspension rebuild completed, we have now installed the upgraded brake booster and the new Koni shock absorbers at the rear of the car. We have also received most of the carb parts back from the polishing shop.
|
|
|
inside LH front wing |
polished |
at the rear |
Your original suspension was in a terrible state and required a complete rebuild, including new shocks, torsion bars, Poly bushings, upper and lower balljoints, wheel bearings, etc, etc.
|
|
|
installed |
|
|
|
|
Wilwood brakes installed |
|
The engine and transmission have now been removed and we have the front suspension rebuild well underway.
|
|
|
|
|
|
|
||
|
|
|
|
||
|
|
|
it was welded as one unit |
be replaced |
exhaust have been ordered |
|
||
|
|
|
'patch' repairs |
|
rebuilt |
|
||
|
|
|
|
|
|
|
||
|
|
|
|
out for polishing |
|
|
||
|
|
|
|
|
the rebuilding process |
The following photographs show the mechanical rebuild/upgrade getting underway.
|
|
|
|
|
|
|
||
|
|
|
front and rear seals |
accept modern seal |
with uprated cams, valves, etc |
|
||
|
|
|
for use with XK tach drive |
|
|
|
||
|
|
|
and machine polished |
cosmetically and mechanically |
|
|
||
|
|
|
|
your shelves |
I hope you enjoy watching as we give this car the full CJ treatment!
|
|
|
|