1972
V12 Jaguar E Type roadster (DW)
Team CJ restoration |
|
Update report - June 11, 2014
We now have your car back on its wheels, rolling and steering. The bonnet, doors and boot lid have been installed, along with all associated latches, etc. All that remains is for us to pack up you remaining parts and the car will be ready for transportation.
Chris Scarborough installing the engine frames, front suspension and IRS..
Front suspension components have been Nickel plated |
Black anodized Grade 8 fasteners used throughout |
New Koni shock absorbers all round |
|
Poly bushings |
|
Uprated CJ road springs |
IRS now installed |
Preparing to remove the body from the jig and set the car back on its wheels..
A couple of shots of the bonnet taken on Thursday immediately after Gerardo had applied the clear coat...
|
|
Painting in progress this afternoon...
|
|
|
|
|
|
Painting the underside of the bodyshell...
|
|
|
|
|
|
|
|
|
|
Applying the first of the new Opalescent Gunmetal paint...
|
|
|
|
The heart and soul of your 7.3 liter Team CJ Supersports engine, including a brand new block and the stroked RBR billet crank, etc.
|
|
Your custom wheels arrived from the UK this morning...
|
|
Trial fitting chrome, windscreen and factory hardtop...
I am pleased to report that we have now finished the bodywork stage of the restoration and your car is in high build Glasurit primer. The following sequence of photos were taken in the CJ parking lot yesterday afternoon. After priming, the body was reassembled using new rubber seals and latches. As you can hopefully tell from the photos, the panel fit on your car is truly spectacular.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Check out some pretty spectacular gains on the flow bench following our port work. We picked up well over 60 cfm at .450" lift on the intake side, which is a significant number for a V12 head.
|
|
|
|
|
|
|
|
|
|
Lots of progress in the CJ Coachworks....
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The following sequence of photos show the repair of both rear quarter panels in progress. We have also bolted and glued the bonnet back together after it was blasted back to bare metal and sealed with Glasurit etching primer.
Back from the blasters, unfortunately the body isn't quite as clean as we had hoped it would be. As well as a few corroded areas, there is also evidence of collision damage at various places around the monocoque. The worst damage is in the boot floor and the lower right hand rear quarter panel.All in all, really not too bad...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
It is time to have this body blasted back to bare metal.
Installing custom oversized valve seats...
|
|
IRS rebuild completed, front and rear suspension components Nickel plated...
|
|
|
|
|
|
|
|
|
|
We have now torn down the front and rear suspension systems and placed the body on a roll-around jig. The differential was in very poor condition, with a number of worn and broken components.
We now have this project well and truly underway. Watch this space!
|
|
|
|
|
|
|
|
|
|
Before tearing into this project, we decided to perform some baseline dyno testing. We will be looking to pick up approximately 250 rear wheel HP, which will put us somewhere around 575 HP at the flywheel, when our work is done.Click on the image of the car below for a short video clip of the baseline dyno test.
|
|
|
|
|
converted to computer mapped fuel injection |
I am pleased to report that we now have your car in place in the CJ workshops and we will have the mechanical rebuild underway in the next few days. I hope you enjoying following the progress over the coming months!