Lots of evidence of the car's original
Opalescent
Silver Blue paintwork
|
|
|
|
|
|
|
|
|
|
|
|
|
Front suspension removed
|
|
|
|
|
Floors are extremely solid
|
|
|
|
|
|
|
Bonnet will be disassembled prior to be
blasted
back to bare metal
|
|
|
|
|
Engine in the CJ machine shop
|
|
|
|
|
|
Using the crane to remove the head
|
|
|
|
|
|
Tearing down the cylinder head
|
This engine was burning a lot of oil prior to
being laid up!
|
|
|
|
|
|
100% blockage behind the petcock (drain tap)
|
|
|
|
|
Water pump could probably stand a rebuild
|
|
|
|
|
|
|
Pressure testing the head after initial
cleaning
|
|
|
|
|
Several water jackets in head are badly
corroded
|
|
|
|
|
|
Surfacing the head after weld repairs to
water jackets
|
Surfacing the head after reshaping the
water jackets on the mill
|
|
|
|
|
Intake and exhaust flanges were machined flat
|
Align honing the cylinder head camshaft caps
|
|
|
|
|
Trial fitting cam bearings after align honing
head
|
Port work underway
|
|
|
|
|
Pressure testing the head after completion of
the port work
|
Outstanding (58 cfm) gain on the flow bench
|
|
|
|
|
Machining the multi-angled valve job
|
Honing tappet guides for oversized RBR tappets
|
|
|
|
|
Installing tappet hold down kit
|
Machine work completed on cylinder head, now
time
for cosmetic polishing, painting and assembly
|