1967
E Type roadster (BP)
Major mechanical rebuild/upgrade |
I am pleased to report that we now have your car back together and back on the road. The rebuilt engine and new CJ5 five speed are performing flawlessly. All that remains is to improve the bonnet and boot lid fit for you, then it will be time to ship the car back to California.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
With the machine work completed, it is now time to re-assemble your engine.
|
|
|
|
|
|
|
|
|
rebuilt rods |
We now have your engine rebuild underway. Your timing chain cover had been hacked about and was not serviceable, although we didn't find any other major issues during the disassembly.
|
|
|
|
|
|
|
We managed to find an alternative RH upper control arm for you and have now completed the suspension rebuild. It is now time to turn our attention to the engine.
|
|
|
|
economical repair! |
|
|
|
|
|
and .020" oversize |
|
|
||
|
To get this project underway, first we pulled the engine and transmission then set about rebuilding the front suspension. In the last photograph below, I have tried to show the wear in the socket of the upper right control arm. As I mentioned to you on the telephone, we have sourced a good used alternative as yours is beyond economical repair.
|
|
|
|
|
One specs |
|
|
|
|
|
will be replaced |