|
|
Another full engine rebuild about to get underway
in the CJ engine machine shop
|
|
|
|
|
|
|
|
|
|
|
|
Oil pan needs several repairs
|
Oil filler cap will be replaced
|
|
|
|
|
This engine is in very poor shape
|
Water jacket on intake flange badly corroded
|
|
|
|
|
Shrapnel damage will require welding
and resurfacing
|
|
|
|
|
|
Damaged gear drive will be replaced
|
Machining out old liners on floating boring bar
|
|
|
|
|
We discovered several cracks between the deck
surface and the upper water jacket
|
Measuring counter bore for top hat sleeve
|
|
|
|
|
Repairing damaged water plugs in top of cyl head
|
|
|
|
|
|
Damaged areas of cylinder head deck required
weld repairs
|
New top hat liners now installed in block
|
|
|
|
|
Boring out tappet guides for oversized
RBR tappets
|
Installing new custom CJ valve seats
|
|
|
|
|
Torque plate honing the new liners to size
|
Machining 5 angled valve job
|
|
|
|
|
About to surface the block deck surface
|
Cylinder head resurfaced after repairs
|
|
|
|
|
Before and after shots of cosmetic polishing
of the front of the head
|
|
|
|
|
|
Head now ready for assembly
|
Going back together on the assembly bench
|