# 1969 (SC) - Jaguar 3.8 E Type
Stage One engine and IRS rebuild |
Update report - April 20, 2011
Putting the finishing touches to this special engine...
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
The short block has now been built and all of the machine work completed on the cylinder head. All that remains is to assemble the head and reunite it with the block.
Lots of progress in the CJ machine shop....
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
I am pleased to report that your rebuilt IRS is being collected on Monday (2/14).
![]() |
![]() |
|
|
![]() |
![]() |
Align hone completed....
![]() |
![]() |
![]() |
We have now installed all the new top hat sleeves and have also machined the block for upgraded freeze plugs.
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
Lots of progress in the machine shop...
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
|
|
|
![]() |
![]() |
|
One slight problem we ran into during the port matching stage was the size and shape of the runners on the Blackwell intake manifold. They are already larger than we would prefer, and a long way from being perfectly round. As we really don't want those ports any larger, we decided to match the cylinder head intake ports to the size (and slightly irregular shape) of the manifold.Click here for a video clip of Chris explaining this process
![]() |
![]() |
|
Installing custom CJ seats, cutting out old cylinder liners....
As this engine will be fuel injected, we are building it to 10.5:1. We will achieve this with a custom set of forged CJ pistons with an increased dome volume. The second photo below shows a mold of the combustion chamber that we made for Ross, so that they could design the dome and maintain adequate piston to valve clearance. These particular pistons will be ceramic coated on the top and Teflon coated on the skirts.
Some interesting background information on your Blackwell manifold. My thanks to Doug Buchan for forwarding the article earlier today.
![]() |
![]() |
I am pleased to report that we have now completed your IRS rebuild....
![]() |
![]() |
![]() |
![]() |
I am pleased to report that your engine and IRS assembly arrived safely at CJ and we have both rebuilds underway.