Assembling the short block, surfacing the cylinder head....
|
|
|
|
|
|
We are almost ready to assemble the short block...
|
|
|
|
|
|
|
|
|
|
|
|
|
The following sequence of photos show the head and block in process. The block is having its new top hat sleeves installed and the head is currently being ported. Interestingly, this particular head flowed better than almost any other unmodified head we have tested, particularly on the intake side. The cylinder head was warped about .0015" so had to be straightened before work on it could begin in earnest.
I am pleased to report that we now have this rebuild underway.
|
|
|
|
|
|
|
|
|
|