|
|
We
start off with an empty casing!
|
New
CJ5 tailhousing
|
|
|
|
|
Custom
(short) shifter rail is
installed
in top cover
|
Cluster
gear in place
|
|
|
|
|
Custom
CJ5 fifth gear, input
and
main shafts
|
Starting
to assemble the mainshaft
|
|
|
|
|
|
Rubber
hose is used as a temporary
clamp
for fifth gear
|
|
|
|
|
|
We
use Timken bearings throughout
|
|
|
|
|
Shaft
now fully assembled
|
Installing
the built up shaft
into
the casing
|
|
|
|
|
|
Time
to install the top cover plate
|
|
|
|
|
Note
speedo gear on mainshaft
|
No
gaskets in the CJ5 transmission
|
|
|
|
|
Installing
the CJ5 tail housing
|
New
billet output flange installed
|
|
|
|
|
Speedo
drive installed in tail housing
|
Serial
# 1-6-05 SF ready for delivery!
|