
|

|
Inspiration for the CJ remodel was shared
between the McLaren factory...
|
...and the restored Aston Martin Works at
Newport Pagnell
|
|
|
|
|
First job was to take down a number of internal walls
|
Main mechanical area will be opened up to
provide more efficient work space
|
|
|
|
|
|
Eventually a new suspended ceiling will be installed
|
|
|
|
|
|
|
|
|
|
|
|
Installing the framework for the new ceiling
|
|
|
|
|
New ceiling tiles going into place
|
|
|
|
|
|
Digging 9 ft deep holes in workshop floor for
new in-ground lifts
|
|
|
|
|
|
Much more room with internal walls removed
|
McLaren Spider and 458 Italia setting the tone..
|
|
|

|
|
All the administrative offices have been remodeled
|
|
|
|

|
|
New epoxy floors
|
Construction underway on second CJ body shop
|
|
|

|

|
Main mechanical area now a hive of activity
|
Main fab shop now completed
|
|
|

|

|
Scraping up floor tiles in trim room
|
|
|
|

|

|
|
|
|
|

|

|
New epoxy flooring being laid
|
|
|
|

|

|
Trim room now completely operational once more
|
Trim room now as immaculate as the cars being
worked on within its walls
|